Up Recent Photos Page » Family 2009 » Marks Summer Project Prev Next Slideshow

 At first page  Next image  Index page
 
 
 
 
 
  IMG_0808.JPG - July 6:  Custom Structures installed the new sliding door where there was only a window before.  The phone line has already been moved and the footings for the new deck dug and poured.  
IMG_0809
IMG_0810
IMG_0812
IMG_0829
IMG_0832

July 6: Custom Structures installed the new sliding door where there was only a window before. The phone line has already been moved and the footings for the new deck dug and poured. Download
Total images: 21 | Help